Jacket Installation for Converter Station DolWin Gamma

  • Installation of jacket and foundation with piles and grouting.


Fender Installation for Barge positioning

  • Installation of 6 fenders to prevent damages by barge on the jacket during topside installation.

Pile Cutting

  • Cut the outer piles as decided from BSH (-12m LAT) to prevent hull damages for ships in distress.

Commissioning Inspection for Certification

  • Check the installed systems for working as requested by risk matrix or predefined function.