Pile Drilling for Wikinger OWF

  • If the pile is blocked during pile driving and the driving doesn't continue with success, use drilling to make the "blocked" pile empty. Then continue with pile driving.

Pile Driving for Wikinger OWF

  • Take a hydraulic hammer to put the piles into the ground of the sea. These piles are the fix points for jacket installation.

Pre Trenching IAC Wikinger OWF

  • pre trench with a plough the designed cable routes inside the windfarm

Pile Load Out for Wikinger OWF