OSS Meerwind Süd Ost: shipping, jacking and grouting
Attendance, monitoring and approval of towing process into the field with additional installing with the floating HLV Oleg Strashnov and followed grouting as TII inspector for certification.
Grouting of Substation Meerwind Südost Project
Grouting with Densit concrete substation to the jacket. Monitoring as TII Inspector for certification of grouting procedure
Commissioning and Sea Fastening OSS Meerwind Südost Project
MWS process and sea fastening of all mobile and installed equipment of Substation Meerwind Südost.
Suitability Survey Meerwind Südost
Suitability Survey for tug boat for towing OSS Topside to wind farm Meerwind Südost.