Installation of boat landings to enter the OSS from CTV
Baltic 2 Jacket (Tripod) Installation
Tripod installation in prepared grounded mono piles on Baltic 2 project with Stainslav Yudin.
Semi-Jacking Test JV Vidar for Baltic 2 Project
Check with a semi jacked vessel and 350 tons water ballast at the crane that the motion of the vessel is within the range from the calculated motion analysis. The test will be important for installing towers, nacelles and rotor star.
Suitability and Sea Fastening Survey Baltic 2 Project
Suitability survey and sea fastening survey of additional rope crane on top of the hatch.